Road · Laid out 1930
Bellflower Road
Bellflower Road
| Location | Map |
| Neighborhood | Shore Acres |
| Laid Out | 1930 |
| Right of Way | 45 ft |
| Pavement | 21 ft |
Bellflower Road is the main street of the Shore Acres neighborhood in East Billerica, on the south side of Salem Road near the Wilmington line. It leaves Salem Road and runs about 3,730 feet southeast, parallel to Salem Road, toward the Shawsheen River. Lilac Road, Verbena Road and Primrose Road connect it with Salem Road, and Larkspur Road and Springwell Road run between them farther on.
It was laid out on the plan "Shore Acres, Billerica, Mass., E. B. Hamilton, Trustee," drawn in July 1937 by Ernest W. Branch, civil engineer, of the Adams Building, Quincy, approved by the Board of Selectmen and recorded in two sheets on August 31, 1937 (Plan Book 61, Plan 25). Bellflower Road runs the length of both sheets, from Salem Road at the west corner of the tract to the lots along the river, with lots of about 5,000 to 10,000 square feet on either side. Its name is one of the plan's set of flower names, with Lilac, Verbena, Primrose, Larkspur and Forsythia. The assessors date the oldest houses on it to about 1930 to 1937, and many more were built in the 1950s and 1960s. In 1947 the town meeting rezoned lot 49 of Shore Acres, on Bellflower Road, owned by Edward F. Scullin, from residence to business, and the 1949 directory describes the road as running "From Springwell to a dead end."
The annual town meeting accepted 1,500 feet of Bellflower Road as a town way on March 13, 1954, under Article 95, and voted $750 to improve it; the highway accounts for 1954 show $735 spent on it. Articles to accept about 1,000 feet more were put on the warrants of 1956 and 1957, the first on a petition of residents and the second by the Street Acceptance Committee, but no acceptance in those years has been found. On April 11, 1970 the annual town meeting voted Article 40, which accepted a list of streets as public ways, Bellflower Road among them.
The low land of Shore Acres has long had drainage trouble. On April 27, 1978 the town meeting voted $67,000 "to correct drainage problems in the Shore Acres area, including Larkspur, Springwell, Primrose, Verbena, Lilac and Bellflower Roads," as the first of two phases. Bellflower Road was hot topped with Type I bituminous concrete in 1980.
References
- Annual Report 1947: warrant Art. 10, rezone lot 49 of Shore Acres on Bellflower Road (Edward F. Scullin) to business
- Annual Report 1947: Art. 10 voted, Planning Board report adopted for the Bellflower Road rezoning
- Annual Report 1953: warrant for 1954, Art. 95 accept Bellflower Road about 1500 feet, Art. 96 $750 to improve it
- Annual Report 1954: highway accounts, Bellflower Road $735 among additional roads repaired
- Annual Report 1956: Streets Accepted by the Town, Bellflower Rd. 1500 ft., 3-13-54
- Annual Report 1955: warrant Art. 64, accept about 1,000 feet more of Bellflower Road, on petition
- Annual Report 1956: warrant Art. 62, accept Bellflower Road about 1,000 feet (Street Acceptance Committee)
- Annual Report 1970: warrant Art. 40, accept streets as public ways, including Bellflower Road
- Annual Report 1970: April 11, 1970, ninth session, Art. 40 voted as written
- Annual Report 1978: April 27, 1978, Art. 55, $67,000 for Shore Acres drainage including Bellflower Road
- Annual Report 1980: streets hot topped with Type I bituminous concrete, including Bellflower Rd.