Road · Laid out 1934

Eastwood Avenue

Eastwood Avenue
Location Map
Neighborhood River Pines
Laid Out 1934
Right of Way 40 ft
Pavement 13 ft


Eastwood Avenue is a short street in River Pines north of the Centre. It runs east from Bridle Road toward the Concord River, just north of River Street.

It was laid out on the plan "River Pines Shores, Billerica, Mass.," drawn in August 1934 by Alfred Millhouse, civil engineer, of South Boston for E. B. Hamilton, trustee, of the Old South Building in Boston, approved by the town's Board of Survey and recorded on August 29, 1934 (Plan Book 58, Plan 43). On the plan Eastwood Avenue is 40 feet wide and runs east from Bridle Road to the edge of the river, with lots on both sides between it and Alderwood Avenue to the north and River Street to the south. Like most streets of River Pines and most of those on the 1934 plan, it was given a name ending in "wood." No record found explains the choice of this name.

The town directories of 1941 to 1951 list "Eastwood Avenue (RP) from Bridle rd to Concord river," with residents on it from 1941. The warrant for the 1954 annual town meeting asked the town to accept "the laying out of Eastwood Avenue a distance of about 500 feet as a town way" and to spend $375 to improve it (Articles 103 and 104). The meeting voted the money, and the town's list of accepted streets printed in 1956 gives "Eastwood Ave. 500 ft. 3-13-54," the opening day of that meeting. The town spent $350 on it in 1954. It was hot-topped with bituminous concrete in 1974 and repaved under the town's roadway management program in 2014.



Eastwood Avenue
River Pines Shores, 1934 (Plan 58/43)

References

  1. Annual Report 1953: warrant for 1954, Arts. 103-104, accept the laying out of Eastwood Avenue about 500 feet as a town way and $375 to improve it
  2. Annual Report 1954: article appropriations, Article 104 Eastwood Avenue $375.00
  3. Annual Report 1954: highway accounts, Eastwood Avenue $350.00 spent
  4. Annual Report 1956: list of streets accepted by the town, Eastwood Ave. 500 ft. 3-13-54
  5. Annual Report 1974: Eastwood Avenue among streets hot topped with Type I bituminous concrete
  6. Annual Report 2014: Eastwood Avenue among roads repaved or reconstructed under the Roadway Management Program