Road · Laid out 1966
Morningside Drive
Morningside Drive
| Location | Map |
| Neighborhood | Pattenville |
| Laid Out | 1966 |
| Right of Way | 55 ft |
| Pavement | 30 ft |
Morningside Drive is a dead-end street in East Billerica, about 640 feet long, running north from Andover Road toward Content Brook and ending in a turnaround; Brookside Drive leaves Andover Road opposite its entrance. It is the street of the "Definitive Plan of Morningside, Billerica, Mass.," owned by Townsman Homes, Inc., and drawn in August 1965 by Emmons, Fleming and Bienvenu, engineers and surveyors, of Billerica, under the seal of John W. Fleming Jr., registered land surveyor. The Planning Board approved it on October 12, 1965, and it was recorded on November 16, 1965 (Plan Book 102, Plan 157). The plan shows the street, called Morningside Drive, curving north from "Andover Street" to a circle near the brook, with eleven lots: ten house lots of about 15,000 to 32,500 square feet and a large lot of about three acres running back to Content Brook. The street takes its name from the subdivision; the plan does not say why that name was chosen.
The assessors date the houses to 1966 and 1967. An article submitted by the Planning Board to accept Morningside Drive as a public way was among the street articles that the annual town meeting of March 1969 postponed indefinitely. The special town meeting of October 21, 1969 then voted Article 8, which accepted a list of streets "in accordance with the layout by the Board of Selectmen," Morningside Drive among them.
Drainage on the street was a recurring problem. At the annual spring town meeting session of May 6, 1999, a petition to raise $30,000 "to correct the water drainage problems that currently exist on Morningside Drive" was lost after the Finance Committee advised against it, but the same session authorized the selectmen to acquire easements for "Morningside Drive Drainage Improvements." The street was repaved under the town's roadway management contracts in fiscal 2005 and crack sealed in fiscal 2017.
References
- Annual Report 1968: warrant for 1969, Art. 87, accept Morningside Drive (Planning Board)
- Annual Report 1969: March 1969 town meeting postpones street Arts. 69-77 and 81-89 incl. Art. 87
- Annual Report 1969: Oct. 21, 1969 special town meeting warrant Art. 8, streets to accept incl. Morningside Drive
- Annual Report 1969: Oct. 21, 1969 special town meeting, Articles 2, 8 and 10 voted
- Annual Report 1999: May 6, 1999 session, $30,000 for Morningside Drive drainage, motion lost
- Annual Report 1999: May 6, 1999, Art. 32, easements for Morningside Drive drainage improvements carried
- Annual Report 2005: roads repaved under roadway management contracts incl. Morningside Dr
- Annual Report 2017: Engineering, roads crack sealed incl. Morningside Drive