Road · Laid out 1950
New Foster Avenue
New Foster Avenue
| Location | Map |
| Neighborhood | Rivermere on the Concord |
| Laid Out | 1950 |
| Right of Way | 36 ft |
| Pavement | 22 ft |
New Foster Avenue runs north and south across the western end of the Rivermere on the Concord neighborhood north of the Centre, about 1,550 feet from Woodlawn Avenue to Bridge Street. Applewood Avenue, Freedom Way, Parkway Avenue, Holly Street, Magnolia Avenue and Dartmouth Drive run west from Bridle Road to meet it or to end just beyond it. Until 1989 it was Foster Avenue.
It was laid out as Foster Avenue on the plan "Rivermere on the Concord at North Billerica, Mass., belonging to Charles Bruce, 1911," drawn by O. M. Snell, civil engineer, of Lowell and recorded on December 5, 1913 (Plan Book 31, Plan 16). The plan shows it near the western edge of the tract, along land of Rogers, crossing the seven streets that run west from Bridle Road. The plan does not explain the name; it also shows land of Foster as an abutter on the river side of the tract, but no record ties the street to that family, and the origin of the name was not found.
The assessors date the oldest houses on the street to about 1950, and most of the rest to the 1950s and 1960s. The 1951 directory lists "Foster Avenue (RP)," for River Pines, "From Woodlawn av to Bridge," and in 1957 the town laid a water main in it. The annual town meeting accepted Foster Avenue as a public way on April 11, 1970, voting under Article 40 "to accept Article 40 as written," a list of twelve streets that also included Holly Street. The later acceptances of Pine Way (1975) and of Woodlawn and Magnolia Avenues (1978) were measured to Foster Avenue or to a dead end west of it.
The street became New Foster Avenue during the town's renaming of duplicated street names, which removed many repeated names between 1988 and 1991; Billerica also had a Foster Street in Rio Vista. The 1989 to 1991 renaming votes are not printed in the town reports. In the registry's property index the name Foster Avenue is last used regularly in April 1989 and New Foster Avenue first appears on May 1, 1989. The street was repaved under the town's roadway program in fiscal 2010, crack sealed in 2013 and repaved or reconstructed in fiscal 2015.
References
- Annual Report 1957: new water mains, including Foster Avenue (River Pines)
- Annual Report 1970: warrant Art. 40, accept streets including Foster Avenue and Holly Street
- Annual Report 1970: April 11, 1970, Article 40 voted as written
- Annual Report 1975: Pine Way accepted from Bridle Road to Foster Avenue
- Annual Report FY2010: roadway paving program, New Foster Avenue repaved
- Annual Report 2013: crack sealing list including New Foster Avenue
- Annual Report FY2015: roads repaved or reconstructed, including New Foster Avenue