Road · Laid out 1957
Norman Road
Norman Road
| Location | Map |
| Neighborhood | Riverview Park |
| Laid Out | 1957 |
| Right of Way | 34 - 50 ft |
| Pavement | 20 ft |
Norman Road is a street of the Riverview Park area in East Billerica, running about 1,100 feet northeast from Harjean Road, near the railroad, across Donald Road and Jordan Road to Whipple Road. It was laid out as Norman Street on "Shawsheen River Pines, Billerica, Mass.," drawn by John Thomas Brown, surveyor, of Twombley Avenue, North Billerica, for Harry and Jeanne Shotz. Unit No. 1, drawn in May 1947, approved by the town's Board of Survey on June 2, 1947 and recorded on June 4, 1947 (Plan Book 70, Plan 88), shows Norman Street, 40 feet wide, as the western end of Donald Road and Jordan Road, running on to Whipple Road. Unit No. 2, drawn in August 1947 and recorded on August 28, 1947 (Plan Book 71, Plan 40), carries it beyond Donald Road toward the Boston and Maine Railroad, beside lots of 7,500 square feet. In December 1961 Jeanne Shotz had the land along Norman Street between Donald Road and Whipple Road redrawn in larger lots of about 15,000 square feet, on a plan recorded on March 8, 1962 (Plan Book 96, Plan 51). Like Donald, Marilyn and Freddy Roads on the same plans, Norman is a given name; the plans do not say whose, and the origin of the name was not found.
The assessors date the oldest house on the street to about 1957 and most of the others to 1965 to 1974. By the early 1970s the town reports call it Norman Road; when "Street" was changed to "Road" is not recorded. Norman Road was number 40 on the list of 62 streets offered for acceptance under Article 40 at the annual town meeting of March 1972, and the record of the meeting lists it among "the following streets" that "were accepted." The Highway Department graded it in 1973 and 1974. In 1974 Norman Road was again among the streets offered for acceptance, and that motion was lost. On April 22, 1975 the annual town meeting voted to accept "the laying out of Norman Road from Donald Road to Whipple Road, the way shown as Norman Street" on the 1947 plan, "a way 40 feet wide and 440 feet more or less long," although the Street Acceptance Committee did not recommend it unless $14,500 was appropriated for "a water main, drainage, road surfacing and bounds." The reports do not say which part of the street the 1972 vote covered. The street was graded again in 1975 and 1976, drainage work was done on it in 1976 and 1980, and it was hot topped in 1977.
References
- Billerica town report 1971 (1969 vol.): warrant for 1972, Art. 40 street acceptance list, no. 40 Norman Road
- Billerica town report 1972 (1969 vol.): Art. 40, "the following streets were accepted," no. 40 Norman Road
- Billerica town report 1973: Highway Dept. streets graded, Norman Road
- Billerica town report 1974: Art. 14, streets incl. Norman Rd offered for acceptance, motion lost
- Billerica town report 1974: Highway Dept. streets graded, Norman Road
- Billerica town report 1975: April 22, 1975 vote accepting Norman Road from Donald Road to Whipple Road, 440 ft
- Billerica town report 1975: Highway Dept. streets graded and graveled, Norman Road
- Billerica town report 1976: Highway Dept. streets graded and drainage projects, Norman Road
- Billerica town report 1977: streets hot topped, Norman Road
- Billerica town report 1980: Highway Dept. drainage work on Norman Rd.