Road · Laid out 1928
Pelham Street
Pelham Street is a street of the Rio Vista section in the northwest part of town, near the Concord River between Nashua Road and Treble Cove Road. It was laid out on the plan of "Rio Vista, Billerica, Mass.," dated June 4, 1928 and drawn by George H. Wetherbee Jr., civil engineer, of Boston and Braintree, which was recorded on August 9, 1928 in Plan Book 52 Plan 58. On that plan Pelham Street runs along the high ground above the river near Colby, Hillcrest and Thoreau Streets. The Rio Vista ("river view") development was large; a report on school housing by the State Department of Education, printed in the town report of 1929, noted that, unlike the summer colonies at River Pines and Shawsheen Pines, "much of the new building that is taking place there will house year-round residences."
The plan gives no reason for the name. Many of the Rio Vista streets were named for places or writers, such as Thoreau and Walden Streets for the Concord author who wrote of the Concord River; Pelham may come from the neighboring town of Pelham, New Hampshire, but no record says so. There was no road here before 1928.
The streets of Rio Vista remained private gravel ways for decades. A new section of Pelham Street was built under the town's subdivision rules after the Rio Vista Subdivision Plan of July 1964 (Plan Book 100 Plan 174), and attempts followed to accept the older part. In 1975 the town meeting voted down a motion to accept a way "from the end of the layout of Pelham Street" through Thoreau, Larchwood, Foster and Hillcrest Streets to Nashua Road, 2,525 feet in all; the street acceptance committee estimated that $64,300 was needed for water, grading, surfacing and drainage. Pelham Street was dismissed again at the fall town meeting of October 14, 1980, and the same layout article was dismissed in 1988. Liberty Drive, which runs south from it, was accepted in 2012. Pelham Street itself was finally accepted at the second session of the annual spring town meeting, on May 4, 2023, under Article 33: "Pelham Street, from Colby Street to dead end (North), approximate length 380' and 40' width right of way," on a plan and profile of August 11, 2021 by Lighthouse Land Surveying, LLC. The vote was 148 to 3.
References
- 1975 annual town meeting, Article 14: motion to accept Pelham, Thoreau, Larchwood and Foster Streets lost; cites the Rio Vista plans of 1928 and 1964
- 1980 fall warrant, Article 23: Pelham St., Precinct 6, among streets to be accepted
- 1980 fall town meeting, Oct. 14, 1980: Rio Vista, Hillcrest, Pelham and Rexhame Streets dismissed
- Town of Billerica FY2023 Annual Report: May 4, 2023 Art. 33, Pelham Street from Colby Street to dead end (North), 380 ft, accepted (148 to 3)