Road · Laid out 1950

Ravine Road

Ravine Road
Location Map
Neighborhood Riverdale
Laid Out 1950
Right of Way 24 ft
Pavement 20 ft


Ravine Road is a short street in Riverdale, running about 820 feet east from Allen Road across Webb Brook to Sylvan Road, near the head of Dell Hollow Road. It was laid out as Pine Road by the civil engineer Edgar P. Sellew on his plan "Camp Lots at Riverdale," dated March 19, 1908 and recorded on May 21, 1908 (Plan Book 25, Plan 12), which added small camp lots to his Riverdale farm plots of 1903. On that plan Pine Road leaves Allen Road north of the older Riverdale Road, crosses Webb Brook and meets Sylvan Road beside Dell Avenue. The directory of 1931 lists "Pine Road from Allen rd to Sylvan rd (Riverdale)," and those of 1941 to 1957 "Pine Road (R), From Allen rd to Hillside rd." At the annual town meeting of 1938 an article to accept "the semicircle formed by Pine Road, Sylvan Road and Riverdale Road" was dismissed and then, on reconsideration, voted, although none of the three appears in the town's list of accepted streets printed in 1956.

A plan of September 1957 by Emmons and Fleming, engineers, still shows "Pine Road" along the north side of a lot bounded by Webb Brook and Riverdale Road (Plan Book 89, Plan 96B). By 1972 the town reports call the street Ravine Road. The date of the change and the reason for the new name have not been found; Billerica had several streets named Pine, and in 1988 the selectmen renamed a Pine Avenue, two Pine Streets and a Pine Way to end the duplication.

The crossing of Webb Brook has needed repeated work. The fall town meeting of 1989 was asked for $500,000 "to repair the bridge located on Ravine Road in the Riverdale section of Billerica," and on October 17, 1989 a motion for $35,000 to repair the culvert was lost; the Engineering Division nevertheless completed the installation of a culvert on Ravine Road in 1990. A replacement culvert, designed with drainage improvements for Ravine Road and Arcadia Road in 1997, was under construction in 1998. Ravine Road was repaved in 2006. When the town accepted Sylvan Road in 2019 it described it as running "from Ravine Road northeast to Riverdale Road"; no vote accepting Ravine Road itself has been found.



Ravine Road
Riverdale, 1908 (Plan 25/12)
Ravine Road
Subdivision Plan of Land in Billerica (Sellew, Land Court), 1909 (LC Plan 2162-B)
Ravine Road
Garden Lots at Riverdale (Edgar P. Sellew), 1912 (Plan 30/93)
Ravine Road
Plan of Land in Billerica, Mass., being a subdivision of Lot F (Emmons and Fleming, Engineers, Reading and Billerica, Sept. 1957), 1957 (Plan 89/96)

References

  1. Billerica report 1938: annual meeting Art. 13, the semicircle formed by Pine Road, Sylvan Road and Riverdale Road
  2. Billerica report 1989: fall warrant Art. 26, $500,000 to repair the bridge on Ravine Road in Riverdale
  3. Billerica report 1989: Oct. 17, 1989 session, motion of $35,000 for the Ravine Road culvert lost
  4. Billerica report 1990: Engineering Division, installation of the culvert on Ravine Road completed
  5. Billerica report 1997: design of the Ravine Road/Arcadia Road drainage improvements completed
  6. Billerica report 1998: construction started on the Ravine Road culvert replacement project
  7. Billerica report 2006: roads repaved or reconstructed, including Ravine Road