Summit Road is a short street in the Pinedale section of Pinehurst, near the Burlington line. It runs southeast from Pinedale Avenue to Folger Street, the former Brown Street, and Callahan Street, the former Chestnut Street, ends at it. It was laid out as Summit Street on the plan "Pinedale Park, Billerica, Mass., 1908," drawn by J. S. Crossman, civil engineer, of Boston and recorded on May 24, 1909 (Plan Book 26, Plan 22). That plan divided Pinedale Park into several hundred small lots on streets with plain names such as Pine, Maple, Birch, Summit, Crystal and Crown. No record explains the choice of Summit, and it refers to no person. The directory of 1919 lists "SUMMIT ROAD from Elm (Pinedale) southerly," Elm Street being the plan name of Pinedale Avenue. The 1931 directory gives "from Pinedale av southerly." The assessor dates the house at No. 1 to about 1940.

Summit Road was among the first streets of the park taken over by the town. On the recommendation of the town's committee, the annual meeting of February 11, 1928 voted to "accept Summit Road from Pinedale Avenue to Brown Street about 500 feet as a Town way." That year the highway surveyor graveled 500 feet of it, treated it with No. 45 road oil "Pinedale Ave., to Brown St." and put up 51 feet of new guard rail, and 200 more feet were graveled in 1929. At the end of 1933 a water main 600 feet long was being completed in it with Civil Works Administration help, and more water mains followed in 1956. The road was scraped, rolled and oiled in 1935; an article of 1936 to retar it with other streets was dismissed. It was tar patched and tarred in 1940 and given an asphalt seal coat over its entire length in 1947. The highway reports of 1948 to 1950 call it "Summit Street." It was hot topped with bituminous concrete in 1968. Summit Road was not on the town map of 1831 and was not among the roads accepted in 2016.



Summit Road
Pinedale Park, 1908 (Plan 26/22)

References

  1. Annual Report of the Town of Billerica, 1927: warrant article to accept Summit Road from Pinedale Avenue to Brown Street, about 500 feet
  2. Annual Report of the Town of Billerica, 1928: Summit Road accepted as a town way, Article 25
  3. Annual Report of the Town of Billerica, 1928: Summit Road graveled 500 feet and treated with No. 45 road oil
  4. Annual Report of the Town of Billerica, 1928: 51 feet of new guard rail on Summit Road
  5. Annual Report of the Town of Billerica, 1929: highway surveyor's report, roads graveled, Summit Road 200 feet
  6. Annual Report of the Town of Billerica, 1933: water main laid 600 feet on Summit Road with Civil Works Administration help
  7. Annual Report of the Town of Billerica, 1935: Summit Road scraped, raked, rolled and oiled
  8. Annual Report of the Town of Billerica, 1940: Summit Road tar patched and tarred
  9. Annual Report of the Town of Billerica, 1947: asphalt seal applied to the entire length of Summit Road
  10. Annual Report of the Town of Billerica, 1956: water mains laid on Arch, Summit and Chestnut Streets
  11. Annual Report of the Town of Billerica, 1956: list of accepted streets, Summit Road accepted 2-11-28
  12. Annual Report of the Town of Billerica, 1968: Summit Road hot topped with bituminous concrete