Road · Laid out 1991
Tow Path Drive
Tow Path Drive is a short street in East Billerica, in the King's Pines neighborhood between Salem Road and the railroad, running about 435 feet northwest from a little beyond the end of Kitchen Avenue to a little beyond Carley Way. It lies on the line of the eastern end of School Street on the "Plan of King's Pines, East Billerica, Mass., owned and developed by B. M. Hein," drawn in September 1914 by Clarence E. Carter, civil engineer, of Reading and recorded on October 1, 1914 (Plan Book 32, Plan 4). School Street ran from Andover Road east past Hill, Farm, Plain, Center, Filer and Little Avenues, which led north to the railroad, as far as Kitchen Avenue, which led down to Canal Street, now Salem Road, all lined with lots 25 feet wide. In the renaming of 1988 to 1991 against duplicate street names School Street became Staples Street. The oldest house on this part dates from 1991.
The street was rebuilt for the Heritage Pines subdivision of the MassKey Development Corp. of Tewksbury, drawn by Raymond Engineering Service of Billerica. Its lot layout sheet, dated May 23, 1997 and recorded on May 11, 1998 (Plan Book 197, Plan 11), shows this stretch as Staples Street, 40 feet wide, running from Ketchen Avenue past the paper Little and Filer Avenues and the new Carley Way to the paper Plain Avenue. Soon afterward it was given a name of its own: the registry indexes "Tow Path Dr" from January 1999, and a mortgage of September 1999 lists it as "Tow Path Dr once Staples St." The name evidently refers to the towpath of the Middlesex Canal, whose old bed runs close by, but no record of the choice has been found. The town's engineers inspected the construction of Heritage Pines in 1999 and 2000, and the other two houses on the street were built in 1996 and 1999.
Listed as "Tow Path Road," the street was repaved in fiscal 2016. At the third session of the annual spring town meeting, on May 8, 2018, the town accepted "Tow Path Drive, formerly Staples Street," under Article 34, "from 135' passing Ketchen Avenue at the SE end of the street to 50' passing Carley Way on the NW end of the street," about 435 feet long with a right of way 40 feet wide, as shown on sheet 5 of the Heritage Pines plans; the vote was 164 to 11.
References
- Annual Report FY2018: warrant Art. 34, accept Carley Way, Ketchen Avenue and Tow Path Drive (Heritage Pines plans)
- Annual Report FY2018: May 8, 2018 session, Art. 34 roads accepted as public ways
- Annual Report FY2018: Art. 34 carried, 164 to 11
- Annual Report FY2016: roads repaved, incl. Carley Way, Ketchen Avenue, Tow Path Road, Demoley Court
- Annual Report 1999: Engineering, inspection of subdivision construction incl. Heritage Pines
- Annual Report 2001: Engineering, subdivisions inspected in 2000 incl. Heritage Pines