Road · Laid out 1927

Walton Street

Walton Street
Location Map
Neighborhood Rio Vista
Laid Out 1927
Right of Way 32 - 46 ft
Pavement 20 - 32 ft


Walton Street runs about 1,700 feet across the middle of the Rio Vista neighborhood, from Nashua Road northeast across Juniper Street, Brandon Street, Dyer Street, Rio Vista Street and Savoy Street to the corner of Rexhame Street and North Rexhame Street. Sutton Street ends on it.

It was first laid out on the plan of "Rio Vista, Billerica, Mass." dated July 1, 1927 and drawn by George H. Wetherbee Jr., civil engineer, of Boston and Braintree for the Rio Vista Co. (Plan Book 51, Plan 49, recorded February 16, 1928). On that plan, the first section of the development, "Walton St." runs from the Chelmsford Road, as Nashua Road was then called on the plan, to Laurel Street, today's Rio Vista Street. The plan of the whole development dated June 4, 1928 (Plan Book 52, Plan 58, recorded August 9, 1928) carried it on across Savoy Street to Rexhame Street. No record found explains the name.

Karl Gladstone's Rio Vista Subdivision Plan of July 1964, drawn by E. Conrad Levy of Lexington and approved by the Planning Board on November 12, 1964 (Plan Book 100, Plan 174), laid out Walton Street 40 feet wide from Dyer Street to Rexhame Street. A petition article at the annual town meeting of March 1971 asked the town to accept Walton Street with four other streets, and the meeting accepted Blossom Drive, Walton Street and Marlyn Road as public ways. The same year the public works department hot topped Walton Street with bituminous concrete and carried out drainage work on it. The street was resurfaced in 1987. In 2019 the water main connection between Nashua Road and Walton Street was replaced with a ten-inch line, and the street was repaved from Nashua Road to Juniper Street in the fiscal year 2020.



Walton Street
Rio Vista, 1928 (Plan 51/49)
Walton Street
Rio Vista, 1928 (Plan 52/58)
Walton Street
Rio Vista, 1964 (Plan 100/174)

References

  1. Annual Report 1971: Article 91 warrant, petition to accept Blossom Drive, Walton, Bedford, Marlyn and Savoy Streets
  2. Annual Report 1971: Article 91, streets accepted: Blossom Drive, Walton Street, Marlyn Road
  3. Annual Report 1971: Walton Street and Savoy Street hot topped with Type I bituminous concrete
  4. Annual Report 1971: drainage projects include Walton Street and Savoy Street
  5. Annual Report 1987: Walton St. resurfaced with Pequot, Savoy and Rexhame Streets
  6. FY2020 Annual Report: Walton Street repaved from Nashua Road to Juniper Street
  7. FY2020 Annual Report: new ten-inch connection from the Nashua Road main into Walton Street


Deed References

Date Type Grantor Grantee Summary Recorded
July 13, 1927 Quitclaim Deed Richard C. Moran Rio Vista Co., a Massachusetts corporation 752/55

Recorded is Book/Page at the Middlesex North Registry of Deeds unless noted.