Road · Laid out 1967

Champa Road

Champa Road
Location Map
Neighborhood Baldwin Park Estates
Laid Out 1967
Right of Way 40 ft
Pavement 30 ft


Champa Road is a residential street in North Billerica that leaves Tercentennial Drive and runs, with a long bend, to Ichabod Lane, in the neighborhoods of Baldwin Park Estates and Sleepy Hollow. Its first part, about 1,560 feet long, was laid out on Content Homes, Inc.'s "Definitive Plan of 'Casa Bella'," drawn by Emmons, Fleming & Bienvenu, Inc., engineers and surveyors, of Billerica, dated January 1969, approved by the Planning Board on April 1, 1969 and recorded on April 3, 1969 (Plan Book 108, Plan 80). That plan shows Champa Road running from Tercentennial Drive and curving to a temporary turnaround, with seventeen lots along it. Content Homes, Inc. continued the street on its "Sleepy Hollow" subdivision, drawn by Emmons, Fleming & Bienvenu, Inc. in February 1971, approved by the Planning Board on May 25, 1971 and recorded in June 1971 (Plan Book 112, Plan 127), which carried Champa Road about 1,355 feet farther to Ichabod Lane. Most of the houses were built from 1969 to 1974.

The origin of the name Champa was not found.

The first part of the road was accepted as a public way at the annual town meeting of 1972, which opened on March 11, 1972, under Article 40, together with Tercentennial Drive, Francesca Way and Angela Lane. The extension came before the town in 1974 and was accepted at the session of April 24, 1975: "a portion of Champa Road Ext. commencing at a point of approximately 1,560 feet from Tercentennial Drive and extending to Ichabod Lane," "a way 50 feet wide and 1,355 feet more or less long," as shown on the "plan and profile Champa Road" of February 1971 with as-built information added. An amendment to spend $300 on the street was lost, after it was stated that $2,200 in bond money was still outstanding in the subdivision. Champa Road was on the town's list of drainage projects in 1973. In 1991 articles to finish the sewer main on Champa Road, part of which had been sewered, were defeated at both the spring and the fall town meetings.



Champa Road
Casa Bella, 1969 (Plan 108/80)
Champa Road
Sleepy Hollow, 1971 (Plan 112/127)

References

  1. Annual Report 1972: annual town meeting warrant Art. 40, Tercentennial Drive, Francesca Way, Angela Lane, Champa Road
  2. Annual Report 1972: Art. 40 vote, Champa Road (no. 4) among the streets accepted
  3. Annual Report 1973: Public Works drainage projects list including Champa Road
  4. Annual Report 1974: warrant list of streets to accept, including Champa Road (Extension)
  5. Annual Report 1975: April 24, 1975 session, Champa Road Extension to Ichabod Lane accepted, 50 ft by 1,355 ft