Road · Laid out 1972
Ichabod Lane
Ichabod Lane
| Location | Map |
| Neighborhood | Sleepy Hollow & Shea Estates |
| Laid Out | 1972 |
| Right of Way | 50 ft |
| Pavement | 30 - 31 ft |
Ichabod Lane is the main street of Sleepy Hollow in North Billerica. It runs about 2,550 feet east from Allen Road to the north end of Lois Lane, where Shane Lane continues, and Champa Road leaves its north side. It was laid out on "Sleepy Hollow, A Subdivision of Land in Billerica, Mass.," owned by Content Homes, Inc. and drawn in February 1971 by Emmons, Fleming & Bienvenu, Inc., engineers and surveyors, of 220 Boston Road, Billerica. The Planning Board approved it on May 25, 1971, and it was recorded on June 25, 1971 in two sheets (Plan Book 112, Plan 127). The plan shows the lane fifty feet wide, running, after a short curve at Allen Road, straight for about 1,580 feet and then bending to meet Lois Lane, with lots of 40,000 to 71,000 square feet along it and larger lots on Champa Road. A gas transmission line crossed the tract near Allen Road, and two strips labeled Heidi Lane and Cheryl Lane ran north toward the streets of the older Ivanhoe Estates subdivision. Four lots on Allen Road, A through D, had been found not to need Planning Board approval and were left out of the subdivision. The assessors date nearly all the houses on the lane to 1974, with a few from 1972 and 1975.
The name comes from Ichabod Crane, the schoolmaster in Washington Irving's tale "The Legend of Sleepy Hollow," which gave the subdivision its name.
On April 24, 1975 the annual town meeting accepted Ichabod Lane "from Allen Road to Lois Lane a distance of 2,550 feet more or less," as shown on a plan and profile by Emmons, Fleming & Bienvenu dated February 1971; the Street Acceptance Committee "did not recommend anything." The same evening the town accepted the extension of Champa Road "to Ichabod Lane," after hearing that there was $2,200 of bond money outstanding in the subdivision; in 1978 the town recorded $1,244.92 from the forfeited Sleepy Hollow bond. The lane lies in the Jones Brook basin, where the town built drainage improvements in 1986 and 1987, and more drain pipe was laid on it in fiscal 2000. When Allen Road was rebuilt from 1988, its first phase ran "from Andover Road to Ichabod Lane." Ichabod Lane was repaved in 2017 and in fiscal 2022, and was repaved or given a pavement preservation treatment in 2024.
References
- Billerica town report 1975: April 24, 1975 town meeting accepts Ichabod Lane, Allen Road to Lois Lane, 2,550 ft
- Billerica town report 1975: Champa Road extension to Ichabod Lane accepted; $2,200 bond outstanding in Sleepy Hollow
- Billerica town report 1978: Planning Board bond forfeiture, Sleepy Hollow, $1,244.92
- Billerica town report 1986: Jones Brook basin drainage at Tercentennial Drive, Francesca Way, Ichabod Lane, Shane Lane
- Billerica town report 1988: Allen Road reconstruction phase I, Andover Road to Ichabod Lane
- Billerica town report 2000: highway drainage project, 200 ft on Ichabod Lane
- Billerica town report 2017: roads repaved incl. Ichabod Lane