Road · Laid out 1965
Fawn Lane
Fawn Lane
| Location | Map |
| Neighborhood |
Deer Run Ranlett Farm |
| Laid Out | 1965 |
| Right of Way | 60 ft |
| Pavement | 31 ft |
Fawn Lane is a short residential street in Deer Run, east of Nashua Road. It runs about 940 feet north from the south line of the subdivision, past the east ends of Doe Drive and Stag Drive, to Ranlett Lane. It was laid out on the "Definitive Plan of Deer Run," drawn in August 1965 by Emmons, Fleming and Bienvenu, engineers and surveyors of Billerica, for H. Allen Jenkins and Sons, Inc., owner; the Planning Board's approval was signed on October 27, 1965 and the plan was recorded the next day (Plan Book 102, Plan 134). The plan's second sheet shows Fawn Lane as a 50-foot street with four lots of 30,000 square feet or more on its east side and the ends of Stag and Doe Drives on its west, and land of the Elm Realty Trust at its north end. There it enters Ranlett Lane through a 55-foot opening that had been left between two house lots on a plan of lots along Ranlett Lane drawn by James B. Monahan in January 1962 (Plan Book 96, Plan 29). Like Stag Drive and Doe Drive, the street takes its name from the deer of the subdivision's name.
The assessors date the oldest house on Fawn Lane to 1965 and most of the others to 1967 and 1968; a few more were built from 1999 to 2006. When the town accepted the inner part of Ranlett Lane on April 12, 1973, the layout ran "from Fawn Lane westerly to cul de sac." Town sewers reached the Deer Run section under Sewer Contract 7, awarded in November 1971 and completed in 1972. After design work in 2002 and 2003 on the roads of "Deer Run Estates," Fawn Lane was repaved or reconstructed in fiscal 2004. No vote accepting Fawn Lane itself as a public way has been found.
References
- Annual Report 1973: Ranlett Lane accepted 4/12/73, 1200 ft x 50 ft, from Fawn Lane westerly to cul de sac
- Annual Report 1971: Sewer Contract 7 awarded Nov. 1971, south to Nashua Road and the Doe Drive area
- Annual Report 1972: sewer construction completed in the Deer Run Section
- Annual Report FY2002: initial design for reconstruction of roadways in Deer Run Estates subdivision
- Annual Report FY2004: roads repaved/reconstructed under contracts 03-R01 and 03-R02, incl. Fawn Ln