Road · Laid out 1965
Stag Drive
Stag Drive is the main street of Deer Run, on the east side of Nashua Road (Route 4) south of Ranlett Lane. It runs east from Nashua Road for about 2,400 feet to Fawn Lane, parallel to and north of Doe Drive. It was laid out on the "Definitive Plan of Deer Run," drawn in August 1965 by Emmons, Fleming and Bienvenu, engineers and surveyors of Billerica, for H. Allen Jenkins and Sons, Inc., owner; the Planning Board's approval was signed on October 27, 1965 and the plan was recorded the next day (Plan Book 102, Plan 134). The plan shows Stag Drive as a straight 50-foot street with lots of 30,000 square feet and 150 feet of frontage on both sides, numbered 8 through 21 on the north and 25 through 38 on the south, bending north at its east end into Fawn Lane; the lots on Nashua Road at its west end were kept by the Jenkins company, which still owned the land to the north. With Doe Drive and Fawn Lane, its name follows the deer of the subdivision's name.
Building was quick: the assessors date most of the houses on Stag Drive to 1966, and nearly all the rest to 1967 through 1969. Town sewers came under Sewer Contract 7, which in 1972 added sewers "in the Ranlett Lane, Stag Drive - Doe Drive areas." In 1981 the town engineer studied "the problem of poor sight distance on Stag Drive," and in 1998 the Highway Division did drainage work on the street. After design work in 2002 and 2003 on the roads of "Deer Run Estates," Stag Drive was repaved or reconstructed in fiscal 2004. No vote accepting Stag Drive as a public way has been found.
References
- Annual Report 1971: Sewer Contract 7 awarded Nov. 1971, south to Nashua Road and the Doe Drive area
- Annual Report 1972: Contract 7 sewers in the Ranlett Lane, Stag Drive and Doe Drive areas
- Annual Report 1981: Town Engineer, poor sight distance on Stag Drive studied
- Annual Report 1998: Highway Division drainage projects incl. Stag Dr.
- Annual Report FY2002: initial design for reconstruction of roadways in Deer Run Estates subdivision
- Annual Report FY2004: roads repaved/reconstructed under contracts 03-R01 and 03-R02, incl. Stag Dr