Glad Valley Drive is the main street of Green Valley Acres, north of Nutting's Lake. It runs about 4,100 feet west from Boston Road, opposite Lexington Road, to French Street. It was laid out on the "Definitive Plan, Subdivision Plan of 'Green Valley Acres' in Billerica, Massachusetts," owned by Home Towne Builders, Inc. and drawn by Anthony J. Canon, registered land surveyor and professional engineer, of Marlborough, dated January 1965. The town clerk received notice of the Planning Board's approval on March 31, 1965, and the plan was recorded on June 8, 1965 in eight sheets (Plan Book 102, Plan 10). It lined Glad Valley Drive with house lots, mostly of about 25,000 square feet, beside a tract of town land on the north side, with Fardon Street running south from it and Clermore Road and Wheeler Road to the south. Building began at once: the assessors date about twenty houses on the street to 1965 and most of the rest to 1966 to 1968.
The origin of the name was not found; it echoes the name of the subdivision. No vote of town meeting accepting Glad Valley Drive as a public way was found in the town reports, but the town has long maintained it. An access road from the town football field to Glad Valley Drive was built in 1971. In 1972 the annual town meeting dismissed an article to borrow $358,000 to extend the town sewer system "to serve Glad Valley Drive and areas adjacent thereto." Glad Valley Drive was on the highway department's lists of drainage projects in 1972, 1973, 1982 and 1994, and in 1974 an eight-inch water main was laid on French Street from the Middlesex Turnpike to Glad Valley Drive. The street was repaved under the town's pavement management contracts in 2004 and crack sealed in 2017.
The junction of Glad Valley Drive with Boston Road and Lexington Road became the subject of a state-aided traffic safety project. In October 2021 the annual fall town meeting appropriated $500,000 for the design, appraisals and easements of the "Boston Road at Lexington Road and Glad Valley Drive traffic and safety improvement project," and the reconstruction of the intersection, with a water main replacement, was under construction in 2025.
References
- 1971 Park Department: access road from the football field to Glad Valley Drive constructed
- 1972 town meeting: Article 32, $358,000 sewer extension to serve Glad Valley Drive dismissed 127-4
- 1972 Highway Department drainage projects list incl. Glad Valley Drive
- 1973 Highway Department drainage projects list incl. Glad Valley Drive
- 1974 water main program: 8-inch main on French Street from the Middlesex Turnpike to Glad Valley Drive
- 1982 Highway drainage projects incl. Glad Valley Drive
- 1994 Highway Division drainage projects incl. "Gladvalley Drive"
- 2004 Roadway Management Contracts 03-R01/03-R02: Glad Valley Dr repaved
- 2017 DPW: Glad Valley Drive among roads crack sealed
- FY22 Annual Report: Oct. 2021 fall town meeting Art. 28, $500,000 design for Boston Rd at Lexington Rd and Glad Valley Dr safety project (PDF p. 178)