Road · Laid out 1965
Green Acre Drive
Green Acre Drive
| Location | Map |
| Neighborhood | Billerica Highlands |
| Laid Out | 1965 |
| Right of Way | 50 ft |
| Pavement | 30 ft |
Green Acre Drive is a residential street in East Billerica that leaves Salem Road near Pichowicz Road and runs west and southwest about 1,230 feet to Lantern Lane. It is the main street of Green Acre Farms, a subdivision of 1964 that also laid out Carline Drive and Lantern Lane.
The street was laid out on the "Definitive Subdivision Plan of Land, Green Acre Farms, Billerica, Mass.," dated May 7, 1964 and drawn by Kenneth J. Miller of the K. J. Miller Co., civil engineers and land surveyors, of Burlington, approved by the Planning Board on June 23, 1964 and recorded on August 17, 1964 (Plan Book 100, Plan 103). The subdivider named in the Planning Board's certificate was Ponderosa Builders, Inc., of Burlington, and the land, "Known as Green Acre Farms," lay between Rogers land on the north, Roberts Homes on the south, Salem Road on the east and land of the town on the west, where the John F. Kennedy School was soon built. The plan carried Green Acre Drive 1,242 feet in from Salem Road, with lots of 15,000 to 35,000 square feet; the board required 28 feet of paving and a sidewalk on the outer side of the street. The street took its name from the subdivision; no earlier farm of that name has been found. The assessors date the houses to 1965 to 1969.
Green Acre Drive was accepted as a public way at the annual town meeting of 1972, as "Greenacre Drive" in the warrant, the thirty-seventh of 62 streets accepted under Article 40 on the motion of the Planning Board, together with Lantern Lane. It was repaved in 2009 after the East Billerica sewer contract 34A.
References
- Annual Report 1972: warrant Art. 40, 62 streets for acceptance incl. Greenacre Drive and Lantern Lane
- Annual Report 1972: Art. 40 vote, the listed streets accepted
- Annual Report 1972: Art. 40 accepted streets list continued, Green Acre Drive (37) and Lantern Lane (39)
- Annual Report 2009: sewer contract 34A completed; Greenacre Drive and Lantern Lane among roads repaved