Road · Laid out 1966

Lantern Lane

Lantern Lane
Location Map
Neighborhood Billerica Highlands
Laid Out 1966
Right of Way 50 ft
Pavement 30 ft


Lantern Lane is a short residential street in East Billerica that runs north about 780 feet from the end of Carline Drive to the west end of Green Acre Drive, beside the grounds of the John F. Kennedy School. It belongs to Green Acre Farms, a subdivision of 1964.

It was laid out on the "Definitive Subdivision Plan of Land, Green Acre Farms, Billerica, Mass.," dated May 7, 1964 and drawn by Kenneth J. Miller of the K. J. Miller Co., civil engineers and land surveyors, of Burlington, approved by the Planning Board on June 23, 1964 and recorded on August 17, 1964 (Plan Book 100, Plan 103). The subdivider named in the Planning Board's certificate was Ponderosa Builders, Inc., of Burlington. On the plan Lantern Lane joins the curve of Carline Drive to Green Acre Drive, among the 34 lots of the subdivision, of about 15,000 to 35,000 square feet; the board required 28 feet of paving and a sidewalk on the inner side of the street. The origin of the name Lantern was not found. The assessors date the houses to 1966 to 1968.

Lantern Lane was accepted as a public way at the annual town meeting of 1972, the thirty-ninth of 62 streets accepted under Article 40 on the motion of the Planning Board, together with Green Acre Drive. In 2007 the water main at Carline Drive and Lantern Lane was extended through the Kennedy School yard to Kimbrough Road to form a loop, and the street was repaved in 2009 after the East Billerica sewer contract 34A.



Lantern Lane
Definitive Subdivision Plan of Land, Green Acre Farms, Billerica, Mass. (K. J. Miller Co., May 7, 1964), 1964 (Plan 100/103)
Lantern Lane
Definitive Plan of Land in Billerica, Mass. of Flintlock Acres (Robert M. Gill and Associates, Aug. 4, 1981), 1982 (Plan 136/59)

References

  1. Annual Report 1972: warrant Art. 40, 62 streets for acceptance incl. Lantern Lane
  2. Annual Report 1972: Art. 40 accepted streets list, Lantern Lane (39)
  3. Annual Report 2008: water main loop from Carline Drive and Lantern Lane through the Kennedy school yard, summer 2007
  4. Annual Report 2009: sewer contract 34A completed; Lantern Lane among roads repaved