Road · Laid out 1970
Ironwood Street
Ironwood Street
| Location | Map |
| Neighborhood | Central Park |
| Laid Out | 1970 |
| Right of Way | 50 ft |
| Pavement | 29 ft |
Ironwood Street runs southeast from Pond Street for about 1,900 feet to Richards Street and Crestwood Lane in the Central Park neighborhood in the eastern part of town. It was laid out as Beech Street on the third sheet of the "Plan of Central Park, Billerica Mass," surveyed in 1913 and 1914 by John N. McClintock and Robert B. Bellamy, engineers, of Dorchester, for James E. Burke, owner, and recorded on April 27, 1914 (Plan Book 31, Plan 49). That sheet, headed "Middlesex Canal Property, John A. Richardson, Owner," laid out five parallel streets, Canal, Oak, Elm, Maple and Beech, from Pond Street to Richardson Street across Broad Street, all lined with lots 25 feet wide; Beech Street was the southernmost of them. The town directories of 1941 to 1957 list "Beech" in Central Park, "From Pond to Richardson." The Beech Street that the town accepted in 1949 was a different street, at Nutting Lake.
After the Supreme Judicial Court ruled in 1963 that Central Park was under the town's subdivision control, the M & T Construction Corp. had Robert P. Morris & Associates of Tewksbury draw a "Definitive Subdivision of a Portion of Central Park," dated September 16, 1969, approved by the Planning Board on May 12, 1970 and recorded on June 2, 1970 (Plan Book 110, Plan 120). The plan gave the old streets tree names: Beech Street became Ironwood Street, while Oak, Elm, Maple and Willow Streets became Tamarak, Sumac, Sourgum and Plum Streets and Broad Street became Broad Leaf Street. Why these names were chosen is not recorded. Most of the houses on Ironwood Street were built from 1970 to 1973. The work did not go well: in 1972 the town's Sewerage and Drainage Committee blamed the Planning Board for "a sub-division on Ironwood Street" where the sidewalks were unfinished and the street drains, with headwalls of loose fieldstone, poured water onto private land, "creating a reservoir of water which is approximately 8'-0" deep."
At the annual town meeting of 1975 the Street Acceptance Committee would not recommend accepting Ironwood Street unless $12,600 was raised, although $7,200 of the developer's bond money was still held, and on April 22 the motion was lost. Two days later, on April 24, 1975, the meeting reconsidered and accepted "the laying out of Ironwood Street from Pond Street to Richards Street," citing both the 1969 plan and the 1914 plan, "being the street also referred to as Beech Street," a way 50 feet wide and 1,720 feet long. The Planning Board's bond on the subdivision was later seized by the town. In 2019 the old water main in the street, which had "numerous failures over the years," was replaced with 1,690 feet of new eight-inch pipe, and the street was repaved in fiscal 2021.
References
- Annual Report 1963: Supreme Judicial Court places the Central Park area under subdivision control
- Annual Report 1972: Sewerage and Drainage Committee on the problems of the subdivision on Ironwood Street
- Annual Report 1975: April 22, 1975, motion to accept Ironwood Street (Beech Street) lost
- Annual Report 1975: April 24, 1975, Ironwood Street reconsidered and accepted, 50 by 1,720 feet
- Annual Report 1989: town accounts, Planning Board bond seized, Ironwood
- Annual Report FY2019: 1,690 feet of new water main in Ironwood Street