Road · Laid out 1920
Richards Street
Richards Street
| Renamed | Richards Street to Richards Street, Jan. 2, 1989 (Street Renaming of 1988-1991) |
| Location | Map |
| Neighborhood | Central Park |
| Laid Out | 1920 |
| Right of Way | 25 ft |
| Pavement | 14 ft |
Richards Street runs northeast from the junction of Salem Road and Bayberry Lane to Ironwood Street in the Central Park neighborhood in the eastern part of town, crossing the southeast ends of Gove Road, Sequoia Street and Moosewood Street. It is the old cross street at the back of the Central Park blocks. On the "Plan of Central Park, Billerica Mass," surveyed in 1913 and 1914 by John N. McClintock and Robert B. Bellamy, engineers, of Dorchester, for James E. Burke, owner, and recorded on April 27, 1914 (Plan Book 31, Plan 49), the long streets of the tract run from Pond Street to "Richardson St formerly Folly Road." The town directories of 1949 to 1957 list "Richardson" in Central Park, "From Salem rd to Canal," and a town meeting warrant of 1953 described a lot "at the corner of Salem Road and Richardson Street (also called road to Sheldon Folly)." The origin of the names Folly Road and Richardson Street has not been found; Billerica had another Richardson Street, in the Centre, which is a different road.
When the M & T Construction Corp. developed the old paper lots after 1963, the "Definitive Subdivision of a Portion of Central Park" drawn by the K. J. Miller Company of Wilmington, dated November 28, 1966 and recorded in 1967 (Plan Book 105, Plan 48), labeled the street "Richards St. (Richardson St.)," and the 1969 plan for the canal section by Robert P. Morris & Associates (Plan Book 110, Plan 120) did the same. The assessors date the oldest houses now on the street to 1971. In 1974 the town engineers drew a plan for "the construction of a portion of Richards Street," drainage work followed in 1975, and in 1975 the town accepted Ironwood Street "from Pond Street to Richards Street."
The street then ran on beyond Ironwood Street. In the selectmen's program against duplicate street names, by their vote of November 14, 1988, effective January 2, 1989, Richards Street was limited to the part "From intersection of Salem Road & Bayberry Lane to Ironwood St.," and the rest, "From Ironwood Street to a dead end beyond Tamarak Street," became Crestwood Lane. On May 23, 1989 an article to accept "Richards Street from the southwesterly side of Gove to Willow Street," a way about 50 feet wide and 1,100 feet long, was referred to the new Street Acceptance Committee by a vote of 107 to 31, and no later vote accepting it has been found. In March 2019 the water division laid 1,650 feet of eight-inch main in Richards Street in place of the old six-inch pipe, completing a loop from Tomahawk Drive through Crestwood Lane and Richards Street to Salem Road, and the street was repaved in fiscal 2021.
References
- Annual Report 1974: Engineering, plan for the construction of a portion of Richards Street
- Annual Report 1975: Highway Department drainage projects incl. Richards Street
- Annual Report 1975: April 24, 1975, Ironwood Street accepted from Pond Street to Richards Street
- Annual Report 1988: selectmen's renaming of Nov. 14, 1988: Richards Street limited to Salem Road-Ironwood St., rest became Crestwood Lane
- Annual Report 1989: May 23, 1989, Art. 48, Richards Street acceptance referred to the Street Acceptance Committee
- Annual Report FY2019: 1,650 feet of new water main in Richards Street, loop to Salem Road