Road · Laid out 1960

Marlyn Road

Marlyn Road
Location Map
Neighborhood Highland Park & Shinkwin Subdivision
Laid Out 1960
Right of Way 48 ft
Pavement 30 ft


Marlyn Road is a residential street near Billerica Centre that runs east from Pond Street about 1,700 feet, past Roberts Road, and curves northeast to a dead end short of Gail Ann Drive. It should not be confused with Marilyn Road in East Billerica, a different street with a similar name; the two appear side by side in the town meeting warrant of 1971.

It was laid out on the "Definitive Subdivision Plan of Highland Park, Billerica, Mass.," owned by A. C. Fillmore, Inc., of Tewksbury, drawn by the K. J. Miller Company, civil engineers and land surveyors, of 106 West Street, Wilmington, and dated March 10, 1967. The Planning Board approved it on July 11, 1967, and it was recorded on September 8, 1967 (Plan Book 105, Plan 146). The plan shows Marlyn Road, 50 feet wide, from Pond Street to a temporary cul-de-sac, with Roberts Road leaving it to the north toward Wright Avenue, now Celtic Avenue, and 24 house lots and a recreation area of 25,000 to 79,000 square feet. Beyond the temporary turnaround the plan carried the road on, one arm northward along a 4.9-acre lot and another east to the end of Gail Ann Drive; neither was built. The plan does not explain the name, and its origin was not found. Most of the houses were built in 1968 and 1969. In 1969 the town laid an emergency eight-inch water main "from Marlyn Road cross-country to Robin Hill Road" to serve Fox Hill.

Marlyn Road was accepted as a public way at the annual town meeting of 1971, under Article 91, a petition article, on the same list as Blossom Drive and Walton Street. Drainage work was done on it in 1972, and it was hot topped in 1981. At the spring town meeting of May 1990 the town voted unanimously to discontinue "the portion of Marlyn Road extending northward from an intersection located approximately two hundred forty (240) feet from the end of Gail Ann Drive," a way 50 feet wide and about 192 feet long, keeping a drain and utility easement over it. In 2017, when the sewer was laid under Sewer Extension Contract 35, the old six-inch water main was replaced with 1,740 feet of ten-inch ductile iron pipe from Pond Street to the easement at the end of the road; the street was repaved in 2018, and in June 2019 the new main was carried on from the end of Marlyn Road to a hydrant at Woodbury Road and Gail Ann Drive.



Marlyn Road
Definitive Subdivision Plan of Highland Park, Billerica, Mass. (K. J. Miller Company, March 10, 1967), 1967 (Plan 105/146)
Marlyn Road
Subdivision Plan, Land in Billerica, Highland Park, Section 2 (James B. Monahan, December 1968), 1969 (Plan 108/114)

References

  1. Annual Report 1969: Fox Hill emergency water main from Marlyn Road cross-country to Robin Hill Road
  2. Annual Report 1971: warrant Art. 91 (petition), Blossom Drive, Walton Street, Bedford Street, Marlyn Road, Savoy Street
  3. Annual Report 1971: Art. 91, streets accepted: Blossom Drive, Walton Street, Marlyn Road
  4. Annual Report 1972: Public Works drainage projects incl. Marlyn Road
  5. Annual Report 1981: streets hot topped incl. Farmers Lane, Marlyn Road, Heritage Road
  6. Annual Report 1990: warrant Art. 41, to discontinue part of Marlyn Road beyond the circle
  7. Annual Report 1990: Art. 41, 192-foot northward portion of Marlyn Road discontinued unanimously
  8. Annual Report 2017: Water Division, ten inch main replaced on Marlyn Road during sewer construction, 1,740 ft
  9. Annual Report 2018: roads repaved or reconstructed incl. Marlyn Road
  10. Annual Report 2019: ten inch main laid from the end of Marlyn Road to Woodbury Road and Gail Ann Drive