Road · Laid out 1972

Poe Road

Poe Road
Location Map
Neighborhood Tower Farm Estates
Laid Out 1972
Right of Way 50 ft
Pavement 31 ft


Poe Road is a street of Tower Farm Estates in North Billerica, about 1,830 feet long. It leaves Tower Farm Road near Boston Road and runs south and east to Whittier Road; Berry Street leaves it. It was laid out on "Tower Farm Estates, a Definitive Subdivision Plan of Land, Billerica, Mass.," owned by J. E. Farmer and drawn by Walter E. Sampson & Assoc., civil engineers and surveyors, of Billerica. The plan is dated June 2, 1969; the Planning Board approved it on October 25, 1969, and it was recorded on March 9, 1970 in five sheets (Plan Book 110, Plan 42). James E. (J. Everett) Farmer and Phyllis C. Farmer had bought the land, "formerly known as the Jones property," from the heirs of Nathaniel R. Jones in February 1969.

The plan does not explain the name. Poe is the surname of the poet Edgar Allan Poe, and with Whittier Road and Frost Street on the same plan it suggests a theme of American poets, but no record of the naming was found.

The assessors date the houses on the road to 1972 to 1981. By 1972 a water main had been laid in Poe Road and Whittier Road, connecting the new twelve inch main in Tower Farm Road with the main in Allen Road, and a sewer pumping station was built on Poe Road at about the same time. Poe Road was offered for acceptance under Article 37 at the annual town meeting of 1976 and dismissed on May 13, 1976. On October 2, 1979, at the fall session of the annual town meeting, the town rezoned from General Business to Neighborhood Residence a strip of the subdivision near Boston Road, beginning "at the northerly end of Poe Road" and taking in lots 8 to 22 and others. On June 2, 1981, under Article 33, the town meeting voted "to accept the laying out of Poe Road, from Tower Farm Road to Whittier Road, a distance of 1,829'," a way 50 feet wide.

In 1997 the town's sewer committee reported that it had been able to "eliminate the 25 year old pumping station at Poe Road, which has been costly to the Town in the past," in its plan for new sewers, but the station was still in use a decade later. On May 22, 2008 the town meeting authorized borrowing $2,000,000 for a gravity sewer along Webb Brook and "for the elimination of the Bertha Circle and Poe Road Pump Stations," and on May 21, 2013 it voted to take the easements needed for the project. During the sewer work about 568 feet of the water main in Poe Road was replaced "from the area of the old sewer pump station" back almost to Whittier Road, as the water division reported in 2015. The road was repaved under the Roadway Management Contracts in fiscal 2002 and crack sealed in 2016.



Poe Road
Tower Farm Estates, 1970 (Plan 110/42)

References

  1. Billerica town report 1969: Planning Board, Tower Farm Estates on Boston Road, formerly the Jones property, some 271 lots
  2. Billerica town report 1976: Article 37 list of streets for acceptance, including the Tower Farm Estates streets
  3. Billerica town report 1976: May 13, 1976 session, Tower Farm Estates streets dismissed
  4. Billerica town report 1981: warrant Article 33, Tower Farm Estates streets for acceptance
  5. Billerica town report 1981: June 2, 1981, Article 33 accepts the Tower Farm Estates streets
  6. Billerica town report 2002: roads repaved under Roadway Management Contracts 00-R02 and 01-R01
  7. Billerica town report 2016: roads crack sealed, including the Tower Farm Estates streets
  8. Billerica town report 1979: Oct. 2, 1979, Article 14 rezones Tower Farm Estates lots and parts of Pratt, Frost and Whittier from business to residence
  9. Billerica town report 1972 (1969 vol.): water main in Poe Road and Whittier Road linking Tower Farm Road and Allen Road mains
  10. Billerica town report 1997: sewer committee plans to eliminate the 25 year old pumping station at Poe Road
  11. Billerica town report 2008: May 20, 2008, Article 22, $2,000,000 to eliminate the Bertha Circle and Poe Road pump stations
  12. Billerica town report 2013: Article 32, easements for the Bertha Circle and Poe Road pump station elimination project
  13. Billerica town report 2015: 568 feet of water main replaced in Poe Road during sewer work


Deed References

Date Type Grantor Grantee Summary Recorded
February 7, 1969 Quitclaim Jonathan Barrington, Lilian Barrington, Thomas H. Barrington, Rachel J. Robinson, Helen L. Jones, Natalie J. Briggs and Alice G. Jones (heirs of Edith F. and Nathaniel R. Jones) James E. Farmer and Phyllis C. Farmer 1876/78

Recorded is Book/Page at the Middlesex North Registry of Deeds unless noted.