Road · Laid out 1930

Preston Street

Preston Street
Location Map
Neighborhood Dane Subdivision
Laid Out 1930
Right of Way 36 ft
Pavement 16 ft


Preston Street is a short street in North Billerica running east from Pollard Street, just north of its junction with Boston Road, to Dane Avenue. It was laid out on Alden O. Dane's house lot plan of "the Chase lot, so called," which also laid out Dane Avenue and Railroad Street. The warrant for the annual town meeting of March 24, 1902 asked the town to raise $100 "to build a street the distance of about 234 feet, on land known as Preston Street, as shown on plans of Alden O. Dane of the Chase lot, so called." The meeting voted "that the town accept Preston Street as laid out by the Selectmen," with $100 for grading it. The work was done in October and November 1902 for $73.63, including $25.25 for graveling, and the town's card index of accepted streets, printed in 1956, gives "Preston St. 3-24-02." The recorded copy of Dane's plan has not been found, and where the name Preston came from is not recorded.

A water main was in Preston Street by 1917, when the water commissioners listed it at a cost of $142.84. An article of 1920 asked them to extend the main "from the Corner of Pollard and Preston Streets to land of Clayton Philbrick on Dane Avenue, a distance of about 225 feet," and was referred to them; "Preston Street No. 2," costing $178.22, appears in their list from 1921. The ten-year highway program that district engineer F. H. Sabin drew up for the town in 1930 set aside $200 for Preston Street in 1934, and in 1933 the street was patched. The town directory of 1942 confused it with its neighbor, listing "Preston or Railroad Avenue (NB), From Pollard to RR."

The assessors date the older of the two houses now on the street to about 1930. Preston Street was graded by the Highway Department in 1979, 1980 and 1981. In 2012 the Water Division replaced the worn two-inch galvanized pipe with 480 feet of eight-inch main "from the main in Pollard Street up Preston Street and to a new hydrant on Dane Avenue," and the street was repaved under the Roadway Management Program in 2013. It is not one of the roads of the 1831 town map accepted in 2016.




References

  1. Annual report 1902: warrant Art. 31, $100 to build Preston Street, about 234 feet, on Alden O. Dane's plan of the Chase lot
  2. Annual report 1903: March 24, 1902 vote accepting Preston Street as laid out by the selectmen, $100 for grading
  3. Annual report 1903: highway expenditures, graveling Preston Street $25.25
  4. Annual report 1917: water construction account lists the Preston Street main, $142.84
  5. Annual report 1920: Art. 40, water main from Pollard and Preston Streets to Dane Avenue, about 225 feet
  6. Annual report 1921: water construction account, Preston Street No. 2, $178.22
  7. Annual report 1930: ten-year highway program, $200 for Preston Street in 1934
  8. Annual report 1933: Superintendent of Public Works, Preston Street patched
  9. Annual report 1956: card index of accepted streets, Preston St. 3-24-02
  10. Annual report 1980: Highway Department, Preston St. among streets graded
  11. Annual report 1981: Highway Department, Preston St. among streets graded
  12. Annual report 2012: 480 feet of eight inch main up Preston Street to a new hydrant on Dane Avenue
  13. Annual report 2013: Roadway Management Program repaving list includes Preston Street and Dane Avenue