Road · Laid out 1930
Sourgum Road
Sourgum Road is a short dead-end way running east from Pond Street in the Central Park neighborhood, between Sumac Street and Ironwood Street, in the part of Central Park laid out on the old Middlesex Canal land. It was laid out as Maple Street on the third sheet of the "Plan of Central Park, Billerica Mass," surveyed from November 1913 to March 1914 by John N. McClintock and Robert B. Bellamy, engineers, of Dorchester for James E. Burke, owner, and recorded on April 27, 1914 (Plan Book 31, Plan 49). That sheet, headed "Middlesex Canal Property, John A. Richardson Owner," shows Maple Street, 50 feet wide, running east from the road at the west edge of the tract between Elm Street and Beech Street, lined on both sides with long rows of small numbered lots. Like Oak, Elm and Beech Streets on the same sheet, it had a tree name.
The present name comes from the "Definitive Subdivision of a Portion of Central Park," drawn by Robert P. Morris and Associates of Tewksbury for M&T Construction Corp., dated Sept. 16, 1969, approved by the Planning Board on May 12, 1970 and recorded on June 2, 1970 (Plan Book 110, Plan 120). It renamed the canal-section streets with new tree names and labels this one "Sourgum Street (Maple Street)"; sour gum is a name of the black gum or tupelo tree. Its neighbors became Sumac Street (Elm), Ironwood Street (Beech) and Tamarak Street (Oak). In the same period the special town meeting of October 21, 1969 was asked to rezone and take for a town sanitary landfill a large block of Central Park lots owned by M&T Construction, including most of the lots along the east part of Maple Street; those articles were not voted.
Only one house has a Sourgum Road address. It stands near Pond Street on Lots 1274 to 1277 of the 1914 plan; the assessors date it to about 1930 and still describe the street as dirt. The selectmen laid out "Sourgum Road from Pond Street for a distance of 475 ft. more or less," but on June 14, 1979 the annual town meeting voted against accepting it after the Street Acceptance Committee reported that it "violates standards." It was offered again as Sourgum Street at the session of April 24, 1980, and the meeting voted not to accept it on the committee's advice. No acceptance has been found. Sourgum Road was on the town's repaving and reconstruction list for fiscal 2021. It is not one of the roads of the 1831 town map accepted in 2016.
References
- Annual report 1969: Oct. 21, 1969 special town meeting Arts. 4 and 5, Central Park lots of M&T Construction proposed for a landfill
- Annual report 1969: Oct. 21, 1969 special town meeting, Arts. 4 and 5 not voted
- Annual report 1979: annual town meeting warrant Art. 27, accept Sourgum Road
- Annual report 1979: June 14, 1979, motion to accept Sourgum Road, 475 feet from Pond Street, lost
- Annual report 1980: annual town meeting warrant Art. 15, Sourgum Street among streets to accept
- Annual report 1980: April 24, 1980, voted not to accept Sourgum Street